| MOQ: | 1 set |
| Price: | $80,000.00/sets 1-1 sets |
| Standard Packaging: | package |
| Delivery Period: | 30 days |
| Supply Capacity: | 20 Set/Sets per Month |
The heat source is steam | ≥0.4Mpa | |||||
The compressed air pressure | ≥0.4Mpa | |||||
The water pressure | ≥0.2Mpa | |||||
Power supply | the three-phase 380 v + 10% for 50 hz | |||||
Drag | ac motor frequency control | |||||
Total Power | 45KW | |||||
| MOQ: | 1 set |
| Price: | $80,000.00/sets 1-1 sets |
| Standard Packaging: | package |
| Delivery Period: | 30 days |
| Supply Capacity: | 20 Set/Sets per Month |
The heat source is steam | ≥0.4Mpa | |||||
The compressed air pressure | ≥0.4Mpa | |||||
The water pressure | ≥0.2Mpa | |||||
Power supply | the three-phase 380 v + 10% for 50 hz | |||||
Drag | ac motor frequency control | |||||
Total Power | 45KW | |||||